1. Power Distribution Improvement At Onshore Gas Terminal (OGT) At Petronas Carigali Sdn Bhd 2. Petronas Methanol Labuan MCC Retrofit 3. Provision of Servicing and Testing of 415V Air Circuit Breaker in Petronas LNG Complex 4. Wiring Modification to existing REF Protection on SB7710 and SB7720 5. Wiring MCC Servicing and Testing |
Power Distribution Improvement At Onshore Gas Terminal (OGT) At Petronas Carigali Sdn Bhd.
 |
Solution Delivered 
Infrakomas Sdn Bhd to supply of material, manpower, equipment and service for reconfiguration of Low Voltage Distribution System at Onshore Gas Terminal OGT).
The project is to improve the reliability and availability of the power supply to OGT and Resak especially during the maintenance.
|
Petronas Methanol Labuan MCC Retrofit  |
Solution Delivered 
Infrakomas Sdn Bhd is responsible for supervise and install of MCC
|
Provision of Servicing and Testing of 415V
Air Circuit Breaker in Petronas LNG Complex  |
Solution Delivered 
Infrakomas Sdn Bhd is responsible for servicing and testing of Air Circuit Breaker (ACB).
|
| Wiring Modification to existing REF Protection on SB7710 and SB7720
|
Solution Delivered 
Infrakomas Sdn Bhd is responsible for wiring modification works to existing GE SR750 relay (REF Element) at SB7710 (ACB-301, ACB-303 & ACB-305) and SB7720 (ACB-501, ACB-503 & ACB-505)
- Preparation of material required from site modification
- PTW need to be approved by PCSB Authorized Person before work begin.
- PPE requirement and safety procedure were strictly follow
- Perform modification work in accordance to job method statement (JMS) and loop check on new cicuitry based on the approved schematic.
|
Wiring MCC Servicing and Testing  |
Solution Delivered 
Infrakomas Sdn Bhd is responsible for servicing and testing of MCC boards at Petronas Chemical Ethylene PolyEthanol (PCEPE).
- Ensure MCC panels in good working condition
- Report to Authorized Personnel of any failure of the component
|