1. Power Distribution Improvement At Onshore Gas Terminal (OGT) At Petronas Carigali Sdn Bhd
2. Petronas Methanol Labuan MCC Retrofit
3. Provision of Servicing and Testing of 415V Air Circuit Breaker in Petronas LNG Complex
4. Wiring Modification to existing REF Protection on SB7710 and SB7720
5. Wiring MCC Servicing and Testing
Power Distribution Improvement At Onshore Gas Terminal (OGT) At Petronas Carigali Sdn Bhd.

Solution Delivered                        

Infrakomas Sdn Bhd to supply of material, manpower, equipment and service for reconfiguration  of Low Voltage Distribution System at Onshore Gas Terminal OGT).

The project is to improve the reliability and availability of the power supply to OGT and Resak especially during the maintenance.

Petronas Methanol Labuan MCC Retrofit

Solution Delivered                       

Infrakomas Sdn Bhd is responsible for supervise and install of MCC

Provision of Servicing and Testing of 415V
Air Circuit Breaker in Petronas LNG Complex

Solution Delivered                       

Infrakomas Sdn Bhd is responsible for servicing and testing of Air Circuit Breaker (ACB).

Wiring Modification to existing REF Protection on SB7710 and SB7720 

 

 

 

 

 

 

 

 

 

Solution Delivered                        

Infrakomas Sdn Bhd is responsible for wiring modification works to existing GE SR750 relay (REF Element) at SB7710 (ACB-301, ACB-303 & ACB-305) and SB7720 (ACB-501, ACB-503 & ACB-505)

  • Preparation of material required from site modification
  • PTW need to be approved by PCSB Authorized Person before work begin.
  • PPE requirement and safety procedure were strictly follow
  • Perform modification work in accordance to job method statement (JMS) and loop check on new cicuitry based on the approved schematic.
Wiring MCC Servicing and Testing 

Solution Delivered                        

Infrakomas Sdn Bhd is responsible for servicing and testing of MCC boards at Petronas Chemical  Ethylene PolyEthanol (PCEPE).

  • Ensure MCC panels in good working condition
  • Report to Authorized Personnel of any failure of the component